Standard drawings and technical documents
Here you will find Council's Standard Drawings for Construction Works.
Please be aware that the Standard Drawings may not reflect current design and construction practice and are provided as a guide only. The standard drawings are currently being reviewed and revised.
The Standard Drawings are to be read in conjunction with Councils Infrastructure Specifications and if there is potential conflict between Drawings and Specifications, the requirements in the Specifications take precedence.
Drawing No. | Drawing Title | File Size | Issue Date |
---|---|---|---|
D133 | Standard Infiltration Drainage System Type 2 | 371.3 kB | January 2007 |
S83 | Standard Footpath Allocations | 119.0 kB | January 2010 |
S114 | Treatment at End New Road Works | 123.1 kB | September 2003 |
S121 | Type A Intersection | 235.9 kB | August 2003 |
S137 | Erosion & Sediment Control Measures - Rural Area | 318.8 kB | June 1997 |
S143 | Erosion & Sediment Control Measures - Urban Area | 383.5 kB | June 1997 |
S144 | Kerb Ramp | 35.4 kB | May 2017 |
S145 | Minimum Access Improvements for Developments | 365.7 kB | August 2003 |
S151 | Standard Footpath | 238.6 kB | May 2006 |
S152 | Standard Cycleway | 75.9 kB | May 2017 |
S155 | Bus Shelter Slab Layout - Cross Sections | 115.8 kB | November 2013 |
S155A | Bus Stop Boarding | 180.2 kB | February 2015 |
S155B | Bus Shelter Typical Drawing | 377.1 kB | November 2018 |
S161 | 416.6 kB 410.4 kB | October 2019 October 2019 |
Technical Documents
Here you will find Technical Documents to assist in meeting Council requirements, along with supplementary documents and information.
Title | Size | Issue Date |
---|---|---|
Draft Basin Agreement Template | 405.6 KB | March 2022 |
Fact Sheet: How to Lodge a Subdivision Certificate | 129.4 KB | March 2023 |
Soil Infiltration Technical Information Sheet | 540 KB | May 2019 |
MUSIC Link Data and Zones | 1.4 MB | September 2011 |
MUSIC Modelling Rainfall Zones Figures (BMT WBM, 2011) | 386.1 kB | August 2022 |
Stormwater Basin Risk Assessment and Mitigation - Technical Guideline | 1.3 MB | January 2024 |
If you require further information, please contact the Development Engineering Team.
Contact Details
Development Engineering Team
Phone: (02) 4988 0409
Email: [email protected]